Solar Flood Lighting System at a Somaliland factory - Permanent 2011
Scope of Work
To remove the temporary solar system from the ablution building’s roof and re-install it on the factories roof. The current steel structure had to be altered so as to be able to fit it onto the factories roof. All LED floodlights around the 6000sq meter factory had to be installed and wired up to the solar system. All solar equipment had to be installed. The battery area had to be secured so as to prevent an accident.
Project equipment supplied
8 x 250 watt solar panels = 2000 watts , Steel structure for panels, 100A MPPT charge controller, 1.2Kw Victron Inverter/charger, 12 x 1660 amp/hr 2V deep cycle batteries, Victron Battery monitor, LED floodlights and all wiring and circuit breakers.