Solar Floodlighting System installed Somaliland factory - Temporary 2011
Scope of Work
To install the factory solar floodlighting system on the roof of the ablution facility as a temporary installation while the factory was being built. All security lights around the canteen, ablution facility, stores and accommodation building had to run off the solar system. All wiring for these lights had to be altered to accommodate the solar system. The steel structure had to be designed and built to fit onto the roof of the building.
Project equipment supplied
180 watts of solar panels, Steel structure for panels, 10A MPPT charge controller, 1.2Kw Intelly Inverter/charger, 4 x 102 amp/hr 12V deep cycle batteries and all wiring.